Lead captured
200A upgrade + EV charger
Permit required · photo scope
01 · The lead comes in
Panel size and scope capture
EV charger, generator, or subpanel scoping questions - panel size and load on file.
Electrical
EV chargers, panel upgrades, generators - project phases from rough-in to final inspection, with safety checklists and permit tracking on every job.
Permit
lifecycle tracking
Submitted → inspection passed/failed gates billing on every project job.
Phased
milestone billing
Rough-in, trim, and final inspection draws on panel and EV installs.
Panel
inventory per site
Main size, slots, and brand on file before the truck rolls.
Load-addition scoping, permit lifecycle, milestone billing, and safety checklists - project-trade workflows done right.
Lead captured
200A upgrade + EV charger
Permit required · photo scope
01 · The lead comes in
EV charger, generator, or subpanel scoping questions - panel size and load on file.
Phases in progress
Rough-in → trim → inspect
Permit fee line-itemed
02 · The quote goes out
Rough-in, trim, and inspection milestones - permit fees line-itemed on the proposal.
Safety in progress
LOTO checklist required
200A panel · 8 slots free
03 · Crew dispatch
Lockout/tagout notes on the job card - arc flash and safety checklist required.
Inspect in progress
Permit passed · final invoice
$4,280 milestone billed
04 · Inspection & payment
Inspection status gates final billing - submitted to passed/failed on the job.
Service in progress
Small-task catalog offered
Referral request sent
05 · They come back
Maintenance and small-task catalog for return visits - tripped breakers to fixture swaps.
Common questions from electrical owners evaluating Robinline.
Robinline
See it work, text us to get set up today, or book a quick call if you want a walkthrough first.